This project involved refurbishment works over all three floors, the project included installing new kitchens, shower room and alterations to the power & data for the new desk layouts.
Over 6000 metres of CAT 5e cable was installed for additional data points and additional Electrak (power track system) was also installed below the false flooring to give additional power points. Separate power circuits was also installed for cleaners sockets.
To gain the correct Lux levels and making sure the emergency lighting conformed to current regulations, additional lighting was installed to various areas of the building.
The project was completed on time and to budget.