Thursday, November 1st, 2018
This project involved refurbishment works over all three floors, the project included installing new kitchens, shower room and alterations to the power & data for the new desk layouts. Over 6000 metres of CAT 5e cable was installed for additional data points and additional Electrak (power track system) was also installed below the false flooring Read more
Wednesday, May 16th, 2018
JMC was asked to design and install a light that would illuminate the Queen’s Harbour Master sign on the sea wall of the river Tamar at night. With no electricity to the sea wall, solar lighting was the best option. JMC installed a unistrut framework so solar panels, battery pack, controller and LED light fitting Read more
Saturday, March 3rd, 2018
Electrical installation involving installing 2 in number 95mm 4core LSF SWA cables that run from the electrical intake room to the new 400amp Eaton MCCB panel board, the cable run is 110 metres with most of the cable contained at high level. JMC hired scissor lifts and boom lifts so the engineers could safety gain Read more
Saturday, October 21st, 2017
The project involved installing a new 4 way 3 phase and neutral Distribution Board to the far end wall of the workshop. 75mm galvanised trunking and 50mm galvanised lighting trunking has been installed to contain the new LSF PVC cables. 20mm galvanised conduits have been installed for drops to double sockets and switched fused connection Read more
Saturday, April 22nd, 2017
With all JMC engineers hold IPAF Cards to use scissor lifts, we hired the correct lift that would gain us height safely to work on the existing Galvanised cable tray that would hold the new 6mm 3core LSF SWA Cable. Once the area was safely barriered off from any mail worker accessing the work area, we Read more