Recent Projects

Saturday, December 5th, 2015

The project involved M&E works to a new reception, waiting area, disabled toilet and five (5) examination rooms.   Electrical New lighting has been installed to the new Examination Rooms, Corridors and Reception, they are controlled via independent marshalling boxes (klik) located in each room. New Emergency Lighting has been installed throughout the new office Read more

Monday, October 19th, 2015

The project involved installing an 800amp 3 phase and neutral supply to a new MCCB panel board that has been located on the wall in the Mains Room adjacent the main incoming panel. 400mm TQ cables have been installed from the Main Panel board to the new MCCB panel board complete with a 240mm CPC Read more

Saturday, September 5th, 2015

The project involved refurbishment to the toilets, various study rooms and the nursery area. Electrical – Boys, Girls & Unisex Toilets New dextra lighting has been installed to the refurbished toilets, they are controlled via PIR microwave sensors. Dyson air blade hand dryers, Myson electric radiators and Heat recovery ventilations units have also been installed Read more

Friday, May 29th, 2015

The Project involved carrying out Electrical, Mechanical and Air Conditioning works.   Electrical JMC installed two 8 way 3phase Distribution Boards and one 5way 1phase Distribution Board. All lighting installed throughout the building is L.E.D, The lighting within the offices are controlled via 2channel absence detectors with luminaires located adjacent to windows controlled via lux Read more