Work Done: Install Distribution Board, Lighting, Power and heating

The project involved installing a new 4 way 3 phase and neutral Distribution Board to the far end wall of the workshop.

75mm galvanised trunking and 50mm galvanised lighting trunking has been installed to contain the new LSF PVC cables.

20mm galvanised conduits have been installed for drops to double sockets and switched fused connection units.

LED Thorn lighting has been installed onto the new 50mm galvanised lighting trunking, integrated emergency battery backup packs are also installed to various light fittings.

3kw Dimplex panel heaters with built-in thermostats and timers are installed around the workshop.

MK metal clad double sockets have been installed over work benches throughout the workshop.

The project was completed on time and to budget.

 